www.archive-ie-2012.com » IE » M » M50

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".

    Archived pages: 9 . Archive date: 2012-07.

  • Title: M50.ie | M50 Motorway | M50 Toll Charges | M50 Information
    Descriptive info: .. Home.. Live Travel Times Traffic.. Tolling.. Operations Maintenance.. Contact Us.. The M50 Upgrade.. Links.. M50 Motorway.. Here you can find all the information you need with regards to the M50 Motorway around Dublin.. Web Design by Webzoo..

    Original link path: /
    Open archive

  • Title: Live Travel Times & Traffic | M50 Test Site
    Descriptive info: Live traffic updates are provided through the National Roads Authority s traffic website.. On the website you can get updated estimated travel times, view regular updated traffic cameras along the M50, road weather conditions and sign up for SMS text email traffic alerts.. Click on the following link for traffic information:.. www.. nratraffic.. ie..

    Original link path: /?page_id=266
    Open archive

  • Title: Operations & Maintenance | M50 Test Site
    Descriptive info: The Operations Maintenance of the M50 is delivered through the M50 Upgrade PPP contract.. The National Roads Authority awarded the Contract in 2007 to M50 Concession Limited, which will operate the motorway until 2042.. M50 Concession Limited operates the entire length of the M50 Motorway Mainline between Junction 3 (M1) in the north and Junction 17 (M11) in the south, a total of 39 km, and their obligations include routine, cyclical and  ...   M50 Concession Limited provides a 24/7 Emergency Response and Vehicle Recovery Service on the M50 and certain additional areas out of the M50 motorway.. Please click on the following links for further information on M50 Concessions Limited´s Emergency Response and Vehicle Recovery Service and updated Planned Road Works that may affect travel times:.. Emergency Response and Vehicle Recovery.. Planned Road Works.. Please visit.. m50concession.. com.. for more information on M50 Concession Limited..

    Original link path: /?page_id=10
    Open archive
  •  

  • Title: Contact Us | M50 Test Site
    Descriptive info: M50 Concession Limited.. Luttrellstown Road.. Diswellstown.. Castleknock.. Dublin 15.. Dublin.. Ireland.. Phone:.. +353 (0)1 823 5888.. Fax:.. +353 (0)1 823 5890.. Email:.. info@m50concession.. Website:.. The National Roads Authority.. St.. Martin s House.. Waterloo Road.. Dublin 4.. +353 (0)1 6602511.. +353 (0)1 6680009.. info@nra.. nra.. E-flow.. PO Box 11302.. Dublin 17.. +353 (0)1 4610011.. Lo Call:.. 1890 501050.. +353 (01)1 4430555.. eflow..

    Original link path: /?page_id=13
    Open archive

  • Title: The M50 Upgrade | M50 Test Site
    Descriptive info: Benefits of the M50 Upgrade.. Significantly improved journey times into and out of Dublin including to/from Dublin Airport, Dublin Port and Dun Laoghaire • Journey times from M1 to the M11 reduced by 50% during the day • Increased road capacity which leads to improved traffic flows and congestion relief • More predictable journey times are improving quality of life for commuters • More efficient journeys for haulers and those using the M50 for business travel • Safer journeys for all M50 users • The upgraded M50 completes a modern motorway network and facilitates interconnectivity between Dublin and the main motorway routes to the north, west and south of Ireland • Improves Luas Red Line journey times through the separation of track and road at Junction 9 (N7 Red Cow interchange) • Modernized motorway network around the capital and linking to the rest of Ireland enhances Ireland’s competitiveness in attracting inward foreign investment • Contributes towards the Government’s road safety strategy.. Contract 1.. Jct 7 (N4 Palmerstown) to Jct 10 (Ballymount).. This element was delivered through a Design Build contract by SIAC-Ferrovial M50 Joint Venture, a partnership between SIAC Construction Ltd and the Spanish Construction Company Ferrovial Agromán S.. A.. , who were joined by a consulting engineering consortium of Hyder Consulting Ltd, PH McCarthy Partners and Grontmij.. Arup Consulting Engineers supervised the contract on behalf of South Dublin County Council and the NRA.. The works delivered under Contract 1 comprised the following:.. • The 8 km section from Junction 7 (N4)  ...   PPP contract for the finance, design, construction and maintenance of the motorway.. The NRA awarded the PPP contract to M50 Concession Limited, a consortium currently comprising Spanish infrastructure developers Global Via Inversiones, S.. (GVI), Sacyr Vallehermoso, S.. and Irish firm P J Hegarty Sons Limited.. The contractor, M50 D C Limited, comprised FCC Construcción Ireland Limited, Sacyr Ireland Limited and PJ Hegarty Sons Limited.. Atkins Consultant Engineers and Eptisa designed the work on behalf of the contractor.. Roughan O’Donovan Limited supervised the contract on behalf of the NRA.. The works delivered Contract 2 comprised the following:.. • Upgrading 25 km of motorway to dual three lane from Junction 3 (M1 Airport Interchange) to Junction 6 (N3 Blanchardstown Interchange) and from Junction 11 (N81 Tallaght Interchange) to Junction 14 (R133 Sandyford Interchange).. • Providing a fourth auxiliary lane along an 18 km section.. • Upgrading seven of the eight interchanges along this section of the M50.. • Major upgrade of junctions at the M1, N2 and N3 from grade separated junctions to free-flow /partially free-flow interchanges.. • 70 principal structures including major crossings of railway lines, as well as the Royal Canal and the river Dodder.. Contract 3.. Junction 6 (N3) to Junction 7 (N4).. The works delivered through Contract 3 comprised the following:.. • Widening a 2 km section of the M50 between Junction 6 (N3 Interchange) and the former West- Link Toll Plaza to dual four lane motorway.. • Removal of the West-Link Toll Plaza and replacement with dual four lane motorway..

    Original link path: /?page_id=99
    Open archive

  • Title: Links | M50 Test Site
    Descriptive info: Please find below useful links to the National Roads Authority, the relevant Local Authorities, M50 Concession Limited and its shareholders and E-Flow.. National Roads Authority:.. Dublin City Council:.. South Dublin County Council:.. Dun Laoghaire Rathdown County Council:.. Fingal County Council:.. M50 Concession Limited:.. Globalvia Inversiones, S.. A:.. Sacyr Vallehermoso, S.. P J Hegarty amp; Sons Limited:.. Eflow:.. dublincity.. sdcc.. dlrcoco.. fingalcoco.. globalvia.. gruposyv.. pjhegarty..

    Original link path: /?page_id=68
    Open archive

  • Title: Tolling | M50 Test Site
    Descriptive info: Tolling Information.. The tolling system on the M50 motorway is operated by E-Flow and should you have queries related to tolling you must contact E-flow directly.. If you need to contact E-Flow please either use the below contact details or click on the following link to go to E-Flow s website:.. LoCall (from Ireland):.. 1890 50 10 50.. Local Area:.. 01 4610011.. UK / NI:.. 0845 30 15 405.. International phone number:.. +800 50 10 50 11.. (mainly from fixed lines only from UK, Germany, Spain, France, US, Italy, Netherlands, Portugal).. If you are having difficulty with this number, please call us on.. +353 1 4610122.. Fax (from Ireland):.. 01 443 0555.. Fax (from outside Ireland):.. +353 1 443 0555.. Post:.. eFlow,  ...   system was a crucial element of the strategy for easing congestion on Ireland’s busiest roadway allowing drivers to travel unencumbered at the legal speed limit along the M50.. Since the commencement of free-flow tolling, traffic volumes on the toll section have been growing and are now in the range of 100,000 vehicles per day, equating to approximately 3 million transactions being processed per month.. Almost 75% of trips on the toll section of the M50 are by motorists who have opened a toll account with 60% of customers having an electronic tag account and 15% availing of the video account option.. The account option allows motorists to avail of lower toll rates than available for motorists who choose not to have an account..

    Original link path: /?page_id=11
    Open archive

  • Title: Emergency Response and Vehicle Recovery | M50 Test Site
    Descriptive info: M50 Concession Limited provides a dedicated 24 Hour emergency response on the M50 Motorway.. Our contractor Kelly s Recovery will respond to emergency situations and should the need arises will tow vehicles of the M50 Motorway to safe location to reduce traffic congestion and increase safety for the motorist  ...   answer all calls relating to M50 Concession Limited.. To ensure there is no delays in arriving to your assistance the Operator may ask for vehicle information, contact details and your location on the M50 Motorway.. Please click link to view scope of Emergency Response and Vehicle Recovery:.. Emergency Reponse Map..

    Original link path: /?page_id=309
    Open archive

  • Title: Planned Road Works | M50 Test Site
    Descriptive info: Latest Traffic Management Report.. This page displays the latest planned traffic management on the M50 motorway.. The information is updated on a regular basis by M50 Concession Limited.. Friday 29th June 2012(Night-Time).. Location.. Direction.. Type of Closure.. Time Closed.. Time Reopened.. Diversion Route.. Operations/3rd Party Works.. Description of Work.. J17 to J13 40,750 to 31,900.. South.. Hard Shoulder.. 25-May.. 13-Jul.. N/A.. 3rd Party Works.. CWS (Fibre Works).. J4 to J3 Northbound.. North.. Aux Lane 1.. 22:00.. 05:00.. Operations.. Graffitti Removal.. Saturday 30th June 2012 (Day Night-Time).. Sunday 1st July 2012 (Day Night-Time).. Monday 2nd July 2012  ...   Traffic Running on Hard Shoulder.. Elmore (Loop Cutting).. Tuesday 3rd July 2012 (Day Night-Time).. N3 Northbound On-Slip.. Lane 1.. Sign Installation.. N3 Southbound Off-Slip.. Wednesday 4th July 2012 (Day Night-Time).. N3 Inbound at Snugborough Interchange.. In-Bound.. Total.. Traffic Diverted via James Connolly Hospital Road to N3 (Blanchardstown) Roundabout.. J17 Southbound CH: 40,150.. Lane 1 2.. Thursday 5th July 2012 (Day Night-Time).. J17 Northbound CH: 39,000 to 35,000.. Lane 2.. J15 Northbound CH: 35,700 to 35,000.. J15 Northbound On-Slip.. Traffic Diverted Southbound to J16 to U-Turn.. Friday 6th July 2012 (Day Night-Time).. N3 Inbound at Snughborough Interchange..

    Original link path: /?page_id=74
    Open archive



  •  


    Archived pages: 9